BOMwiki

Concentrate Metering Pump Assembly

Sourcing — likely vendors

Real suppliers (🇮🇳 🇸🇬 🇨🇳); price, MOQ & lead time are estimates
VendorHQSpecialtyEst. unit priceMOQLead time
🇮🇳Kirloskar
kbl.co.in ↗
Pune, IN Pumps & fluid systems $111 200 units 6–10 wks
🇨🇳Leo Group
leo.com.cn ↗
Taizhou, CN Pumps $87 200 units 6–10 wks
🇮🇳Shakti Pumps
shaktipumps.com ↗
Pithampur, IN Pumps $83 200 units 6–10 wks
🇨🇳CNP Pumps
cnppumps.com ↗
Hangzhou, CN Pumps $108 200 units 6–10 wks
🇮🇳Roto Pumps
rotopumps.com ↗
Noida, IN Pumps $99 200 units 6–10 wks

A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials

3 top-level lines · 10 rows shown · 23 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Stator Assembly 3 parts stator-assembly 1 3 assembly
1.1 Stator Core (laminations) stator-core 1 part
1.2 Copper Winding copper-winding 1 part
1.3 Slot Insulation stator-insulation 1 part
2 Rotor Assembly 4 parts rotor-assembly 1 19 assembly
2.1 Rotor Shaft rotor-shaft 1 part
2.2 Rotor Core rotor-core 1 part
2.3 Neodymium Magnet neodymium-magnet 16× 16 part
2.4 Ball Bearing ball-bearing 1 part
3 O-Ring Set oring-set 1 part

Used in 1 assembly