Proportioning Pump Set Assembly
Sourcing — likely vendors
Real suppliers (🇮🇳 🇸🇬 🇨🇳); price, MOQ & lead time are estimates| Vendor | HQ | Specialty | Est. unit price | MOQ | Lead time |
|---|---|---|---|---|---|
| kbl.co.in ↗ | Pune, IN | Pumps & fluid systems | $222 | 200 units | 6–10 wks |
| leo.com.cn ↗ | Taizhou, CN | Pumps | $211 | 200 units | 6–10 wks |
| shaktipumps.com ↗ | Pithampur, IN | Pumps | $171 | 200 units | 6–10 wks |
| cnppumps.com ↗ | Hangzhou, CN | Pumps | $208 | 200 units | 6–10 wks |
| rotopumps.com ↗ | Noida, IN | Pumps | $237 | 200 units | 6–10 wks |
Meters acid and bicarbonate concentrates. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
2 top-level lines · 12 rows shown · 47 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Concentrate Metering Pump 3 parts | dialysis-machine-metering-pump | 2× | 2 | 23 | assembly |
| 1.1 | Stator Assembly 3 parts | stator-assembly | 1× | 2 | 3 | assembly |
| 1.1.1 | Stator Core (laminations) | stator-core | 1× | 2 | — | part |
| 1.1.2 | Copper Winding | copper-winding | 1× | 2 | — | part |
| 1.1.3 | Slot Insulation | stator-insulation | 1× | 2 | — | part |
| 1.2 | Rotor Assembly 4 parts | rotor-assembly | 1× | 2 | 19 | assembly |
| 1.2.1 | Rotor Shaft | rotor-shaft | 1× | 2 | — | part |
| 1.2.2 | Rotor Core | rotor-core | 1× | 2 | — | part |
| 1.2.3 | Neodymium Magnet | neodymium-magnet | 16× | 32 | — | part |
| 1.2.4 | Ball Bearing | ball-bearing | 1× | 2 | — | part |
| 1.3 | O-Ring Set | oring-set | 1× | 2 | — | part |
| 2 | O-Ring Set | oring-set | 1× | 1 | — | part |