BOMwiki

Control Board Assembly

Sourcing — likely vendors

Real suppliers (🇮🇳 🇸🇬 🇨🇳); price, MOQ & lead time are estimates
VendorHQSpecialtyEst. unit priceMOQLead time
🇨🇳JLCPCB
jlcpcb.com ↗
Shenzhen, CN PCB fabrication $24 100 pcs 2–4 wks
🇨🇳PCBWay
pcbway.com ↗
Shenzhen, CN PCB fab & assembly $20 100 pcs 2–4 wks
scc.com.cn ↗ Shenzhen, CN PCB manufacturer $19 100 pcs 2–4 wks
shogini.com ↗ Mumbai, IN PCB manufacturer $23 100 pcs 2–4 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg $16 100 pcs 2–4 wks

Main board with touch display, encoders and power switching. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials

7 top-level lines · 7 rows shown · 17 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Bare PCB pcb-bare 1 part
2 Microcontroller mcu 1 part
3 Triac triac 2 part
4 Relay relay 2 part
5 LCD Panel lcd-panel 1 part
6 Rotary Encoder espresso-machine-encoder 2 part
7 Connector connector 8 part

Used in 1 assembly