BOMwiki

Control System Assembly

Sourcing — likely vendors

Real suppliers (🇮🇳 🇸🇬 🇨🇳); price, MOQ & lead time are estimates
VendorHQSpecialtyEst. unit priceMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg $174 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg $185 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg $135 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg $176 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg $157 1,000 pcs 6–10 wks

Integrated furnace control sequencing ignition, blower, and safety limits. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials

6 top-level lines · 12 rows shown · 136 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Integrated Furnace Control (IFC) 6 parts gas-furnace-control-board 1 123 assembly
1.1 Bare PCB pcb-bare 1 part
1.2 Microcontroller mcu 1 part
1.3 Relay relay 4 part
1.4 Flame-Rectification Sense IC gas-furnace-flame-sense-ic 1 part
1.5 Connector connector 6 part
1.6 SMD Passive (R/C/L) smd-passives 110× 110 part
2 24 V Control Transformer gas-furnace-transformer 1 part
3 High-Limit Switch gas-furnace-limit-switch 1 part
4 Flame Rollout Switch gas-furnace-rollout-switch 2 part
5 Wire Bundle wire-bundle 1 part
6 Connector connector 8 part

Used in 1 assembly