Support Tower System
AssemblyIntermediate steel or lattice towers spaced 30–80 m apart along the slope, carrying the haul rope over idler sheaves. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Support Tower System
5 top-level lines as of r27715| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Tower Foundation | chairlift-tower-base | 4× | 4 | · | part |
| 2 | Tower Leg | chairlift-tower-legs | 8× | 8 | · | part |
| 3 | Cross Bracing | chairlift-tower-cross-brace | 4× | 4 | · | part |
| 4 | Idler Sheave | chairlift-idler-sheave | 4× | 4 | · | part |
| 5 | Idler Bearing | chairlift-idler-bearing | 8× | 8 | · | part |