BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Support Frame

Assembly

Base frame and upper mounting structure anchoring the lift to the floor or mezzanine deck. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Support Frame parts and their functions

4 top-level parts · 42 parts in total · full bill of materials below
Support Frame parts diagram: 1 base frame, 2 upper mount bracket, 3 anchor bolt, 4 fastener set. 42 parts in 4 top-level items.
Support Frame parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Base Frame 1× Welded steel base frame, 2–3 m × 1.5–2.0 m
2 Upper Mount Bracket 1× Upper beam or bracket for upper end support
3 Anchor Bolt 8× Foundation anchor bolts, M20–M24
4 Fastener Set 32× Frame and mounting fasteners

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Support Frame

4 top-level lines · 4 rows shown · 42 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Base Frame mezzanine-goods-lift-base-frame 1× 1 · part
2 Upper Mount Bracket mezzanine-goods-lift-upper-mount 1× 1 · part
3 Anchor Bolt mezzanine-goods-lift-anchor-bolt 8× 8 · part
4 Fastener Set fastener-set 32× 32 · part

Something wrong in this list? Report a problem with this BOM.

Where the support frame is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Bharat Forge
bharatforge.com ↗
Pune, IN Forgings & metal parts 500 pcs 6–10 wks
dicastal.com ↗ Qinhuangdao, CN Aluminium castings & wheels 500 pcs 6–10 wks
tataautocomp.com ↗ Pune, IN Auto components 500 pcs 6–10 wks
🇸🇬Beyonics
beyonics.com ↗
Singapore Precision metal & mfg 500 pcs 6–10 wks
sundaram-clayton.com ↗ Chennai, IN Die castings 500 pcs 6–10 wks