Passenger Cab
AssemblyLightweight cylindrical car that acts as the piston inside the tube. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Passenger Cab parts and their functions
7 top-level parts · 12 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Cab Frame | 1× | Aluminum and steel skeleton holding the cab wall panels, rated for about 205 kg payload. |
| 2 | Cab Head Plate | 1× | Sealing head plate |
| 3 | Cab Floor | 1× | Composite floor panel with anti-slip surface and underside stiffeners. |
| 4 | Cab Door | 1× | Curved sliding door |
| 5 | Guide Shoe | 6× | Anti-rotation guides |
| 6 | LCD Panel | 1× | Floor indicator |
| 7 | Speaker | 1× | Voice and alarm annunciator |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Passenger Cab
7 top-level lines · 7 rows shown · 12 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Cab Frame | pneumatic-vacuum-elevator-cab-frame | 1× | 1 | · | part |
| 2 | Cab Head Plate | pneumatic-vacuum-elevator-cab-roof | 1× | 1 | · | part |
| 3 | Cab Floor | pneumatic-vacuum-elevator-cab-floor | 1× | 1 | · | part |
| 4 | Cab Door | pneumatic-vacuum-elevator-cab-door | 1× | 1 | · | part |
| 5 | Guide Shoe | pneumatic-vacuum-elevator-guide-shoe | 6× | 6 | · | part |
| 6 | LCD Panel | lcd-panel | 1× | 1 | · | part |
| 7 | Speaker | speaker | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the passenger cab is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |