BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Platform

Assembly

Open passenger platform, typically 900 × 1,400 mm, with non-slip deck, folding access ramp, grab rail and an obstruction-sensing underpan. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Platform parts and their functions

5 top-level parts · 6 parts in total · full bill of materials below
Platform parts diagram: 1 platform deck, 2 folding ramp, 3 grab rail, 4 underpan sensor, 5 sheet metal panel. 6 parts in 5 top-level items.
Platform parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Platform Deck 1× Non-slip deck plate
2 Folding Ramp 1× Folding access ramp
3 Grab Rail 1× Side grab rail
4 Underpan Sensor 1× Obstruction-sensing pan
5 Sheet Metal Panel 2× Side guard panels

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Platform

5 top-level lines · 5 rows shown · 6 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Platform Deck wheelchair-platform-lift-deck 1× 1 · part
2 Folding Ramp wheelchair-platform-lift-ramp 1× 1 · part
3 Grab Rail wheelchair-platform-lift-grab-rail 1× 1 · part
4 Underpan Sensor wheelchair-platform-lift-underpan 1× 1 · part
5 Sheet Metal Panel sheet-panel 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the platform is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks