Ropes and Wire Guide
AssemblySteel wire ropes and guide wires ensuring safe vertical travel without sway or rotation. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Ropes and Wire Guide parts and their functions
3 top-level parts · 16 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Suspension Ropes | 4× | 16 mm steel wire rope, 1960 MPa grade |
| 2 | Guide Ropes | 4× | 12 mm steel guide wire per side |
| 3 | Rope Attachment | 8× | Socket or swaged rope terminations |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Ropes and Wire Guide
3 top-level lines · 3 rows shown · 16 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Suspension Ropes | wind-turbine-service-lift-suspension-ropes | 4× | 4 | · | part |
| 2 | Guide Ropes | wind-turbine-service-lift-guide-ropes | 4× | 4 | · | part |
| 3 | Rope Attachment | wind-turbine-service-lift-rope-attachments | 8× | 8 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the ropes and wire guide is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.10–$30. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| motherson.com ↗ | Noida, IN | Wiring harness & modules | 1,000 sets | 4–6 wks |
|
🇮🇳Polycab
polycab.com ↗
|
Mumbai, IN | Wires & cables | 1,000 sets | 4–6 wks |
|
🇨🇳Luxshare
luxshare-ict.com ↗
|
Dongguan, CN | Connectors & cables | 1,000 sets | 4–6 wks |
|
🇨🇳Hengtong
hengtonggroup.com ↗
|
Suzhou, CN | Cables | 1,000 sets | 4–6 wks |
|
🇮🇳Finolex
finolex.com ↗
|
Pune, IN | Wires & cables | 1,000 sets | 4–6 wks |