BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items

You are viewing r23045 of this page, not the current version. Go to current · history

Synchronization System

Assembly

Crossed steel cables that force both carriages to travel at the same height. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Bill of materials for Synchronization System

4 top-level lines as of r23045
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Synchronization Cable car-parking-lift-sync-cable 2× 2 · part
2 Cable Sheave car-parking-lift-sheave 4× 4 · part
3 Cable Tensioner car-parking-lift-cable-tensioner 2× 2 · part
4 Ball Bearing ball-bearing 4× 4 · part