Pump Head
AssemblyA peristaltic pump chamber with inlet tubing drawing from the reservoir and outlet tubing leading to the solenoid valve. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Pump Head parts and their functions
5 top-level parts · 5 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Pump Chamber | 1× | Molded plastic pump body |
| 2 | Inlet Tube | 1× | Flexible polyurethane inlet tube |
| 3 | Outlet Tube | 1× | Flexible outlet tube |
| 4 | Pump Roller Blade | 1× | Roller blade pressing on pump tubing |
| 5 | Fastener Set | 1× | Tubing clamps |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Pump Head
5 top-level lines · 5 rows shown · 5 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Pump Chamber | automatic-soap-dispenser-pump-chamber | 1× | 1 | · | part |
| 2 | Inlet Tube | automatic-soap-dispenser-pump-tubing-inlet | 1× | 1 | · | part |
| 3 | Outlet Tube | automatic-soap-dispenser-pump-tubing-outlet | 1× | 1 | · | part |
| 4 | Pump Roller Blade | automatic-soap-dispenser-pump-roller-blade | 1× | 1 | · | part |
| 5 | Fastener Set | fastener-set | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the pump head is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $5–$2k. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| kbl.co.in ↗ | Pune, IN | Pumps & fluid systems | 200 units | 6–10 wks |
| leo.com.cn ↗ | Taizhou, CN | Pumps | 200 units | 6–10 wks |
| shaktipumps.com ↗ | Pithampur, IN | Pumps | 200 units | 6–10 wks |
| cnppumps.com ↗ | Hangzhou, CN | Pumps | 200 units | 6–10 wks |
| rotopumps.com ↗ | Noida, IN | Pumps | 200 units | 6–10 wks |