Telescoping Pole
AssemblyA lightweight carbon-fiber pole extending from 4 to 30 feet, with male/female couplers and a quick-disconnect coupling at the head for attaching brush or other tools. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Telescoping Pole parts and their functions
4 top-level parts · 14 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Pole Section | 6× | Carbon tube section with coupler |
| 2 | Lock Ring Coupler | 6× | Quick-lock ring couplers |
| 3 | Head Coupling | 1× | Quick-disconnect female coupler at tip |
| 4 | Safety Lanyard | 1× | Tether rope preventing tool loss |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Telescoping Pole
4 top-level lines · 4 rows shown · 14 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Pole Section | water-fed-pole-section | 6× | 6 | · | part |
| 2 | Lock Ring Coupler | water-fed-pole-lock-rings | 6× | 6 | · | part |
| 3 | Head Coupling | water-fed-pole-head-coupling | 1× | 1 | · | part |
| 4 | Safety Lanyard | water-fed-pole-safety-lanyard | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the telescoping pole is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $1–$200. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳JLCPCB
jlcpcb.com ↗
|
Shenzhen, CN | PCB fabrication | 100 pcs | 2–4 wks |
|
🇨🇳PCBWay
pcbway.com ↗
|
Shenzhen, CN | PCB fab & assembly | 100 pcs | 2–4 wks |
| scc.com.cn ↗ | Shenzhen, CN | PCB manufacturer | 100 pcs | 2–4 wks |
| shogini.com ↗ | Mumbai, IN | PCB manufacturer | 100 pcs | 2–4 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 100 pcs | 2–4 wks |