BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Deployment Kit

Assembly

Transport cases, stakes, and repair items packing the whole system onto one trailer or truck bed. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Deployment Kit parts and their functions

4 top-level parts · 7 parts in total · full bill of materials below
Deployment Kit parts diagram: 1 transport case, 2 stake and guy kit, 3 field repair kit, 4 zone signage set. 7 parts in 4 top-level items.
Deployment Kit parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Transport Case 4× Wheeled roto-molded case sized so two responders can move each module.
2 Stake and Guy Kit 1× Ground stakes and guy lines securing the enclosure in wind to about 60 km/h.
3 Field Repair Kit 1× Patch material, spare nozzles, and couplings for in-service fixes.
4 Zone Signage Set 1× Lane and zone markers

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Deployment Kit

4 top-level lines · 4 rows shown · 7 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Transport Case decon-shower-system-transport-cases 4× 4 · part
2 Stake and Guy Kit decon-shower-system-stake-kit 1× 1 · part
3 Field Repair Kit decon-shower-system-repair-kit 1× 1 · part
4 Zone Signage Set decon-shower-system-signage 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the deployment kit is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks