BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Wastewater Recovery

Assembly

Bermed containment floor and transfer pumping that capture contaminated runoff for later disposal. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Wastewater Recovery parts and their functions

5 top-level parts · 5 parts in total · full bill of materials below
Wastewater Recovery parts diagram: 1 containment pool liner, 2 sump transfer pump, 3 wastewater bladder, 4 waste transfer hose, 5 sump level float. 5 parts in 5 top-level items.
Wastewater Recovery parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Containment Pool Liner 1× Welded-seam berm liner under the full enclosure footprint, holding 1000–2000 L of runoff.
2 Sump Transfer Pump 1× Submersible chemical-rated pump moving runoff from the liner sump to external storage.
3 Wastewater Bladder 1× Collapsible 2000–5000 L pillow tank holding contaminated water for licensed disposal.
4 Waste Transfer Hose 1× Marked chemical-rated hose dedicated to the dirty side and never reused for supply.
5 Sump Level Float 1× Float switch starting the sump pump before runoff reaches grating level.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Wastewater Recovery

5 top-level lines · 5 rows shown · 5 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Containment Pool Liner decon-shower-system-containment-pool 1× 1 · part
2 Sump Transfer Pump decon-shower-system-sump-pump 1× 1 · part
3 Wastewater Bladder decon-shower-system-waste-bladder 1× 1 · part
4 Waste Transfer Hose decon-shower-system-waste-hose 1× 1 · part
5 Sump Level Float decon-shower-system-level-float 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the wastewater recovery is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks