BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Electrical and Control System

Assembly

Generates and distributes electrical power and runs the supervisory control system for pumps, monitors and alarms. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Electrical and Control System parts and their functions

6 top-level parts · 26 parts in total · full bill of materials below
Electrical and Control System parts diagram: 1 diesel generator set, 2 main switchboard, 3 pump and monitor controller, 4 12 v battery, 5 power supply, 6 wire bundle. 26 parts in 6 top-level items.
Electrical and Control System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Diesel Generator Set 2× Diesel generator set
2 Main Switchboard 3 parts 1× Main distribution switchboard
3 Pump and Monitor Controller 4 parts 1× Pump and monitor controller
4 12 V Battery 2× Engine start and DC supply
5 Power Supply 2× Control system power supply
6 Wire Bundle 1× Vessel cable harness

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Electrical and Control System

6 top-level lines · 13 rows shown · 26 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Diesel Generator Set fireboat-generator 2× 2 · part
2 Main Switchboard 3 parts fireboat-switchboard 1× 1 10 assembly
2.1 Circuit Breaker Bank fireboat-breaker-set 1× 1 · part
2.2 Relay relay 8× 8 · part
2.3 Power Meter fireboat-power-meter 1× 1 · part
3 Pump and Monitor Controller 4 parts fireboat-control-pcb 1× 1 9 assembly
3.1 Bare PCB pcb-bare 1× 1 · part
3.2 Microcontroller mcu 1× 1 · part
3.3 SMD Passive (R/C/L) smd-passives 1× 1 · part
3.4 Connector connector 6× 6 · part
4 12 V Battery lv-battery 2× 2 · part
5 Power Supply power-supply 2× 2 · part
6 Wire Bundle wire-bundle 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the electrical and control system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks