Internal Fit System
AssemblyStraps and comfort hardware positioning the suit on the wearer and managing visor alignment. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Internal Fit System parts and their functions
4 top-level parts · 5 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Internal Waist Belt | 1× | Adjustable belt taking suit weight off the shoulders and stopping the visor riding up when crouching. |
| 2 | Crotch Strap | 1× | Strap holding suit torso length down so the wearer can raise arms without lifting the hood. |
| 3 | Sleeve Tether | 2× | Retains sleeves on arm withdrawal |
| 4 | Airline Pass-through | 1× | Optional external air feed |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Internal Fit System
4 top-level lines · 4 rows shown · 5 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Internal Waist Belt | hazmat-suit-waist-belt | 1× | 1 | · | part |
| 2 | Crotch Strap | hazmat-suit-crotch-strap | 1× | 1 | · | part |
| 3 | Sleeve Tether | hazmat-suit-glove-tether | 2× | 2 | · | part |
| 4 | Airline Pass-through | hazmat-suit-airline-passthrough | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the internal fit system is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |