Step-Through Frame
AssemblyWelded hi-tensile steel step-through frame joining the head tube, seat mast and rear axle cradle. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Step-Through Frame
6 top-level lines as of r56316| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Step-Through Main Tube | electric-trike-main-tube | 1× | 1 | · | part |
| 2 | Rear Subframe | electric-trike-rear-subframe | 1× | 1 | · | part |
| 3 | Head Tube | electric-trike-head-tube | 1× | 1 | · | part |
| 4 | Seat Mast | electric-trike-seat-mast | 1× | 1 | · | part |
| 5 | Ball Bearing | ball-bearing | 2× | 2 | · | part |
| 6 | Fastener Set | fastener-set | 1× | 1 | · | part |