BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Table Top

Assembly

High-pressure laminate top, typically 76 × 38 cm, with raised edges, an antimicrobial surface, and on some models a flip-up mirror compartment. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Table Top parts and their functions

5 top-level parts · 6 parts in total · full bill of materials below
Table Top parts diagram: 1 top panel, 2 edge banding, 3 vanity tray, 4 vanity mirror, 5 cup recess. 6 parts in 5 top-level items.
Table Top parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Top Panel 1× Laminate work surface
2 Edge Banding 1× Sealed PVC edge
3 Vanity Tray 1× Flip-top vanity recess
4 Vanity Mirror 1× Vanity mirror
5 Cup Recess 2× Moulded cup wells

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Table Top

5 top-level lines · 5 rows shown · 6 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Top Panel hospital-overbed-table-top-panel 1× 1 · part
2 Edge Banding hospital-overbed-table-edge-band 1× 1 · part
3 Vanity Tray hospital-overbed-table-vanity-tray 1× 1 · part
4 Vanity Mirror hospital-overbed-table-mirror 1× 1 · part
5 Cup Recess hospital-overbed-table-cup-recess 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the table top is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks