Base Cabinet Assembly
AssemblyEnclosed storage beneath the worktop, with drawers, shelves, and cabinet doors, sized to fit under the bench and align with the frame legs. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Base Cabinet Assembly parts and their functions
6 top-level parts · 11 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Cabinet Frame | 1× | Welded steel or bolted wood frame |
| 2 | Cabinet Side Panel | 2× | Left and right enclosure panels |
| 3 | Cabinet Door | 2× | Hinged or sliding cabinet doors |
| 4 | Cabinet Shelf | 3× | Internal compartment shelves |
| 5 | Cabinet Drawer | 2× | Full-extension drawers for supplies |
| 6 | Storage Lock | 1× | Hazardous chemical storage lock |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Base Cabinet Assembly
6 top-level lines · 6 rows shown · 11 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Cabinet Frame | laboratory-bench-cabinet-frame | 1× | 1 | · | part |
| 2 | Cabinet Side Panel | laboratory-bench-cabinet-side-panel | 2× | 2 | · | part |
| 3 | Cabinet Door | laboratory-bench-cabinet-door | 2× | 2 | · | part |
| 4 | Cabinet Shelf | laboratory-bench-cabinet-shelf | 3× | 3 | · | part |
| 5 | Cabinet Drawer | laboratory-bench-cabinet-drawer | 2× | 2 | · | part |
| 6 | Storage Lock | laboratory-bench-cabinet-lock | 1× | 1 | · | part |
Where the base cabinet assembly is used
2 products across 2 domains contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatforge.com ↗ | Pune, IN | Forgings & metal parts | 500 pcs | 6–10 wks |
| dicastal.com ↗ | Qinhuangdao, CN | Aluminium castings & wheels | 500 pcs | 6–10 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 pcs | 6–10 wks |
|
🇸🇬Beyonics
beyonics.com ↗
|
Singapore | Precision metal & mfg | 500 pcs | 6–10 wks |
| sundaram-clayton.com ↗ | Chennai, IN | Die castings | 500 pcs | 6–10 wks |