Service Utility Tower
AssemblyVertical column mounted at the bench end or rear, integrating utility outlets: compressed gas ports (nitrogen, air, vacuum), water taps, and 120 V AC receptacles. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Service Utility Tower parts and their functions
6 top-level parts · 7 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Tower Post | 1× | Aluminum or steel vertical column |
| 2 | Gas Manifold | 1× | Multi-port gas regulator and splitter |
| 3 | Water Tap | 1× | Dual hot/cold water spigot |
| 4 | Tower Power Outlet | 2× | NEMA 5-15 duplex outlets |
| 5 | Tower Conduit | 1× | Cable and hose routing duct |
| 6 | Drain Line | 1× | Return drain line for sink overflow |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Service Utility Tower
6 top-level lines · 6 rows shown · 7 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Tower Post | laboratory-bench-tower-post | 1× | 1 | · | part |
| 2 | Gas Manifold | laboratory-bench-gas-manifold | 1× | 1 | · | part |
| 3 | Water Tap | laboratory-bench-water-tap | 1× | 1 | · | part |
| 4 | Tower Power Outlet | laboratory-bench-power-outlet | 2× | 2 | · | part |
| 5 | Tower Conduit | laboratory-bench-tower-conduit | 1× | 1 | · | part |
| 6 | Drain Line | laboratory-bench-drain-tube | 1× | 1 | · | part |
Where the service utility tower is used
2 products across 2 domains contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |