BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Shelf and Hook Fit-Out

Assembly

Internal hat shelf, coat rail or hooks, and optional extras fitted to each compartment. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Shelf and Hook Fit-Out parts and their functions

5 top-level parts · 10 parts in total · full bill of materials below
Shelf and Hook Fit-Out parts diagram: 1 hat shelf, 2 coat rail, 3 coat hook, 4 shelf clip, 5 number plate. 10 parts in 5 top-level items.
Shelf and Hook Fit-Out parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Hat Shelf 1× Upper fixed shelf
2 Coat Rail 1× Hanging rail
3 Coat Hook 3× Side and back hooks
4 Shelf Clip 4× Shelf support clips
5 Number Plate 1× Compartment number plate

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Shelf and Hook Fit-Out

5 top-level lines · 5 rows shown · 10 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Hat Shelf locker-cabinet-hat-shelf 1× 1 · part
2 Coat Rail locker-cabinet-coat-rail 1× 1 · part
3 Coat Hook locker-cabinet-coat-hooks 3× 3 · part
4 Shelf Clip locker-cabinet-shelf-clips 4× 4 · part
5 Number Plate locker-cabinet-number-plate 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the shelf and hook fit-out is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks