BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Table Top Assembly

Assembly

Laminate, wood veneer, or solid-surface worktop, typically 0.7–1.0 m wide and 0.8–1.2 m long, with bevelled or profiled edge and a cleanable matte or gloss finish. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Table Top Assembly parts and their functions

4 top-level parts · 4 parts in total · full bill of materials below
Table Top Assembly parts diagram: 1 top panel, 2 table edge, 3 top sub-frame, 4 pedestal bushing. 4 parts in 4 top-level items.
Table Top Assembly parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Top Panel 1× Laminate or veneer surface
2 Table Edge 1× Protective edge trim
3 Top Sub-Frame 1× Plywood sub-panel for mounting to base
4 Pedestal Bushing 1× Sleeve or collar joining top to pedestal

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Table Top Assembly

4 top-level lines · 4 rows shown · 4 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Top Panel restaurant-booth-table-top-panel 1× 1 · part
2 Table Edge restaurant-booth-table-edge-banding 1× 1 · part
3 Top Sub-Frame restaurant-booth-table-top-frame 1× 1 · part
4 Pedestal Bushing restaurant-booth-table-leg-bushing 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the table top assembly is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks