BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Back Assembly

Assembly

Steam-bent crest rail and vertical spindles that spring under load and return the sitter upright. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Back Assembly parts and their functions

5 top-level parts · 20 parts in total · full bill of materials below
Back Assembly parts diagram: 1 crest rail, 2 back spindle, 3 back post, 4 lumbar rail, 5 spindle wedge. 20 parts in 5 top-level items.
Back Assembly parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Crest Rail 1× Steam-bent or laminated top rail that ties the spindle tops together and supports the shoulders.
2 Back Spindle 7× Tapered flexing spindles
3 Back Post 2× Outer structural posts
4 Lumbar Rail 1× Mid-height bent rail through which the spindles pass, positioning back support at the lumbar curve.
5 Spindle Wedge 9× Through-tenon wedges

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Back Assembly

5 top-level lines · 5 rows shown · 20 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Crest Rail rocking-chair-crest-rail 1× 1 · part
2 Back Spindle rocking-chair-back-spindle 7× 7 · part
3 Back Post rocking-chair-back-post 2× 2 · part
4 Lumbar Rail rocking-chair-lumbar-rail 1× 1 · part
5 Spindle Wedge rocking-chair-spindle-wedge 9× 9 · part

Something wrong in this list? Report a problem with this BOM.

Where the back assembly is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks