BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Fold-Out Mechanism

Assembly

Riveted steel tri-fold linkage that stows the mattress in three layers under the seat and extends to about 190 cm when opened. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Fold-Out Mechanism parts and their functions

7 top-level parts · 46 parts in total · full bill of materials below
Fold-Out Mechanism parts diagram: 1 mechanism side frame, 2 linkage arm, 3 cross tube, 4 pivot rivet, 5 locking cam, 6 handle bar, 7 coil spring. 46 parts in 7 top-level items.
Fold-Out Mechanism parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Mechanism Side Frame 2× Left and right linkage plates
2 Linkage Arm 8× Folding lever arms
3 Cross Tube 5× Lateral torque tubes
4 Pivot Rivet 24× Shouldered pivot rivets
5 Locking Cam 2× Over-center position locks
6 Handle Bar 1× Pull-out grab bar
7 Coil Spring 4× Counterbalance springs

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Fold-Out Mechanism

7 top-level lines · 7 rows shown · 46 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Mechanism Side Frame sofa-bed-mech-side-frame 2× 2 · part
2 Linkage Arm sofa-bed-linkage-arm 8× 8 · part
3 Cross Tube sofa-bed-cross-tube 5× 5 · part
4 Pivot Rivet sofa-bed-pivot-rivet 24× 24 · part
5 Locking Cam sofa-bed-locking-cam 2× 2 · part
6 Handle Bar sofa-bed-handle-bar 1× 1 · part
7 Coil Spring coil-spring 4× 4 · part

Something wrong in this list? Report a problem with this BOM.

Where the fold-out mechanism is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks