BOMwiki the bill-of-materials encyclopedia
30,390,942 parts mapped · 192,471 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Footrest Assemblies

Assembly

Height-adjustable foot cups with retention straps whose real job is spoke protection: they place a solid barrier between the child's feet and the rear wheel. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Footrest Assemblies parts and their functions

4 top-level parts · 8 parts in total · full bill of materials below
Footrest Assemblies parts diagram: 1 foot cup, 2 foot straps, 3 footrest rails, 4 spoke guard. 8 parts in 4 assemblies.
Footrest Assemblies parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Foot Cup Foot cups
2 Foot Straps Foot retention straps
3 Footrest Rails Adjustment rails
4 Spoke Guard Leg/spoke guards

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Footrest Assemblies

4 top-level lines · 4 rows shown · 8 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Foot Cup cbs-foot-cup 2 · part
2 Foot Straps cbs-foot-straps 2 · part
3 Footrest Rails cbs-footrest-rails 2 · part
4 Spoke Guard cbs-spoke-guard 2 · part

Where the footrest assemblies is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks