BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Recoil Starter

Assembly

Rope-pull starter that spins the crankshaft through ratcheting pawls and rewinds on a spiral spring. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Recoil Starter parts and their functions

4 top-level parts · 5 parts in total · full bill of materials below
Recoil Starter parts diagram: 1 starter rope, 2 starter pulley, 3 coil spring, 4 starter pawl. 5 parts in 4 top-level items.
Recoil Starter parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Starter Rope 1× 3 mm braided rope and grip
2 Starter Pulley 1× Rope drum
3 Coil Spring 1× Rewind spiral spring
4 Starter Pawl 2× Engagement pawls on the flywheel hub

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Recoil Starter

4 top-level lines · 4 rows shown · 5 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Starter Rope earth-auger-starter-rope 1× 1 · part
2 Starter Pulley earth-auger-starter-pulley 1× 1 · part
3 Coil Spring coil-spring 1× 1 · part
4 Starter Pawl earth-auger-starter-pawl 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the recoil starter is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks