BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Hopper Bag

Assembly

Large mesh-backed fabric bag on a tubular frame that catches swept debris while letting air and dust escape, with a rope-dump for emptying. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Hopper Bag parts and their functions

5 top-level parts · 11 parts in total · full bill of materials below
Hopper Bag parts diagram: 1 collection bag, 2 bag frame, 3 dump rope, 4 frame return spring, 5 bag hook. 11 parts in 5 top-level items.
Hopper Bag parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Collection Bag 1× 300–500 L mesh bag
2 Bag Frame 1× Tubular support
3 Dump Rope 1× Seat-side empty cord
4 Frame Return Spring 2× Frame return springs
5 Bag Hook 6× Bag attachment hooks

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Hopper Bag

5 top-level lines · 5 rows shown · 11 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Collection Bag lawn-sweeper-bag 1× 1 · part
2 Bag Frame lawn-sweeper-bag-frame 1× 1 · part
3 Dump Rope lawn-sweeper-dump-rope 1× 1 · part
4 Frame Return Spring lawn-sweeper-bag-spring 2× 2 · part
5 Bag Hook lawn-sweeper-bag-hooks 6× 6 · part

Something wrong in this list? Report a problem with this BOM.

Where the hopper bag is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks