BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Formulation Tank

Assembly

Reservoir holding the oil- or water-based insecticide concentrate, gravity- and pulse-fed to the vaporising coil. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Formulation Tank parts and their functions

5 top-level parts · 5 parts in total · full bill of materials below
Formulation Tank parts diagram: 1 solution tank, 2 tank strainer, 3 pickup tube, 4 vented cap, 5 sight window. 5 parts in 5 top-level items.
Formulation Tank parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Solution Tank 1× 4–6 L
2 Tank Strainer 1× Mesh strainer at the fill mouth keeping grit out of the dosing valve and coil.
3 Pickup Tube 1× Tube drawing solution from the tank base toward the trigger valve and heating coil.
4 Vented Cap 1× Vented cap
5 Sight Window 1× Translucent strip showing remaining solution level during fogging.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Formulation Tank

5 top-level lines · 5 rows shown · 5 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Solution Tank mosquito-fogger-solution-tank 1× 1 · part
2 Tank Strainer mosquito-fogger-tank-strainer 1× 1 · part
3 Pickup Tube mosquito-fogger-pickup-tube 1× 1 · part
4 Vented Cap mosquito-fogger-tank-cap 1× 1 · part
5 Sight Window mosquito-fogger-sight-window 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the formulation tank is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks