BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Steam Generator

Assembly

Small electrode-free electric boiler that flashes fill water to low-pressure steam at 3–18 kW, protected by a safety valve and low-water cut-off. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Steam Generator parts and their functions

8 top-level parts · 10 parts in total · full bill of materials below
Steam Generator parts diagram: 1 boiler vessel, 2 heating element, 3 safety relief valve, 4 water level probe, 5 sight glass, 6 fill port, 7 pressure sensor, 8 o-ring set. 10 parts in 8 top-level items.
Steam Generator parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Boiler Vessel 1× Stainless shell
2 Heating Element 3× Immersion, 3–6 kW each
3 Safety Relief Valve 1× 0.5 bar relief
4 Water Level Probe 1× Low-water cut-off
5 Sight Glass 1× Tubular gauge glass showing boiler water level between marked min and max lines.
6 Fill Port 1× Wide-mouth capped opening with strainer for topping up the boiler between batches.
7 Pressure Sensor 1× Transduces fluid or gas pressure into an electrical signal.
8 O-Ring Set 1× Set of elastomer rings seated in grooves to seal static or slow-moving joints against fluid and gas, sized to ISO 3601.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Steam Generator

8 top-level lines · 8 rows shown · 10 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Boiler Vessel soil-sterilizer-boiler-vessel 1× 1 · part
2 Heating Element heating-element 3× 3 · part
3 Safety Relief Valve soil-sterilizer-safety-valve 1× 1 · part
4 Water Level Probe soil-sterilizer-level-probe 1× 1 · part
5 Sight Glass soil-sterilizer-sight-glass 1× 1 · part
6 Fill Port soil-sterilizer-fill-port 1× 1 · part
7 Pressure Sensor pressure-sensor 1× 1 · part
8 O-Ring Set oring-set 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the steam generator is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $2–$500. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Inovance
inovance.com ↗
Shenzhen, CN Drives & motion control 500 units 10–14 wks
🇮🇳Sona Comstar
sonacomstar.com ↗
Gurugram, IN EV driveline & motors 500 units 10–14 wks
🇨🇳Broad-Ocean
broad-ocean.com ↗
Zhongshan, CN Electric motors 500 units 10–14 wks
nidec.com ↗ Singapore Motors, regional ops 500 units 10–14 wks
🇮🇳Bosch India
bosch.in ↗
Bengaluru, IN Automotive components 500 units 10–14 wks