BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Basin Assembly

Assembly

Double-walled tub that holds about 5 litres of water, with splash guard, drain, and sealed motor wells. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Basin Assembly parts and their functions

6 top-level parts · 9 parts in total · full bill of materials below
Basin Assembly parts diagram: 1 inner tub, 2 outer shell, 3 splash guard cover, 4 drain spout, 5 o-ring set, 6 anti-slip foot pad. 9 parts in 6 top-level items.
Basin Assembly parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Inner Tub 1× Inner PP basin
2 Outer Shell 1× Cosmetic housing
3 Splash Guard Cover 1× Hinged cover
4 Drain Spout 1× Pour-off channel
5 O-Ring Set 1× Shaft and well seals
6 Anti-Slip Foot Pad 4× Anti-slip feet

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Basin Assembly

6 top-level lines · 6 rows shown · 9 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Inner Tub electric-foot-spa-tub 1× 1 · part
2 Outer Shell electric-foot-spa-outer-shell 1× 1 · part
3 Splash Guard Cover electric-foot-spa-splash-guard 1× 1 · part
4 Drain Spout electric-foot-spa-drain-spout 1× 1 · part
5 O-Ring Set oring-set 1× 1 · part
6 Anti-Slip Foot Pad electric-foot-spa-foot-pad 4× 4 · part

Something wrong in this list? Report a problem with this BOM.

Where the basin assembly is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks