BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Water Tank

Assembly

The translucent reservoir that holds water and feeds it to the heating chamber. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Water Tank parts and their functions

6 top-level parts · 7 parts in total · full bill of materials below
Water Tank parts diagram: 1 translucent reservoir, 2 fill cap, 3 tank gasket, 4 o-ring set, 5 max-fill marker, 6 mounting boss. 7 parts in 6 top-level items.
Water Tank parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Translucent Reservoir 1× Translucent reservoir
2 Fill Cap 1× Fill cap with seal
3 Tank Gasket 1× Tank gasket
4 O-Ring Set 1× Cap and port o-rings
5 Max-Fill Marker 1× Max-fill line marker
6 Mounting Boss 2× Tank mounting bosses

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Water Tank

6 top-level lines · 6 rows shown · 7 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Translucent Reservoir handheld-garment-steamer-reservoir 1× 1 · part
2 Fill Cap handheld-garment-steamer-fill-cap 1× 1 · part
3 Tank Gasket handheld-garment-steamer-tank-gasket 1× 1 · part
4 O-Ring Set oring-set 1× 1 · part
5 Max-Fill Marker handheld-garment-steamer-fill-line 1× 1 · part
6 Mounting Boss handheld-garment-steamer-mounting-boss 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the water tank is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks