Timer Control Unit
AssemblyFront panel with a 0–60 minute wind-up timer, temperature selector, and indicator lamp. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Timer Control Unit parts and their functions
6 top-level parts · 7 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Mechanical Timer | 1× | Mechanical 60 min |
| 2 | Temperature Selector Switch | 1× | Heat range switch |
| 3 | Relay | 1× | Heater bank switching |
| 4 | Heat Indicator Lamp | 1× | Heat-on neon |
| 5 | Control Panel Bezel | 1× | Panel moulding |
| 6 | Control Knob | 2× | Timer + heat knobs |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Timer Control Unit
6 top-level lines · 6 rows shown · 7 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Mechanical Timer | hooded-hair-dryer-timer | 1× | 1 | · | part |
| 2 | Temperature Selector Switch | hooded-hair-dryer-temp-selector | 1× | 1 | · | part |
| 3 | Relay | relay | 1× | 1 | · | part |
| 4 | Heat Indicator Lamp | hooded-hair-dryer-indicator-lamp | 1× | 1 | · | part |
| 5 | Control Panel Bezel | hooded-hair-dryer-control-bezel | 1× | 1 | · | part |
| 6 | Control Knob | hooded-hair-dryer-knob | 2× | 2 | · | part |
Where the timer control unit is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |