BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Lather Chamber

Assembly

Pressurized metal vessel heating and storing shaving lather solution before dispensing. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Lather Chamber parts and their functions

5 top-level parts · 5 parts in total · full bill of materials below
Lather Chamber parts diagram: 1 vessel body, 2 heating jacket, 3 vessel gasket, 4 fill cap, 5 pressure sensor. 5 parts in 5 top-level items.
Lather Chamber parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Vessel Body 1× Stainless steel 304 pressure vessel (2–3 L capacity)
2 Heating Jacket 1× Electric resistance heater wrapped around vessel
3 Vessel Gasket 1× Silicone gasket for removable filling cap
4 Fill Cap 1× Hinged or screw-threaded refill cover
5 Pressure Sensor 1× Transducer monitoring chamber pressure (0–3 bar)

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Lather Chamber

5 top-level lines · 5 rows shown · 5 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Vessel Body hot-lather-machine-vessel-body 1× 1 · part
2 Heating Jacket hot-lather-machine-heating-jacket 1× 1 · part
3 Vessel Gasket hot-lather-machine-vessel-gasket 1× 1 · part
4 Fill Cap hot-lather-machine-fill-cap 1× 1 · part
5 Pressure Sensor pressure-sensor 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the lather chamber is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks