BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Hose Assembly

Assembly

High-pressure hose connecting compressor to gun, and solution line from pump to gun mixing chamber. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Hose Assembly parts and their functions

4 top-level parts · 6 parts in total · full bill of materials below
Hose Assembly parts diagram: 1 air hose, 2 fluid hose, 3 quick-couplers, 4 hose coils. 6 parts in 4 top-level items.
Hose Assembly parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Air Hose 1× 6 mm ID rubber hose, 150 PSI rated, 5 m length
2 Fluid Hose 1× Silicone hose 3 mm ID rated for self-tan solution
3 Quick-Couplers 3× Quick-connect push-lock couplers
4 Hose Coils 1× Coil hose organizer preventing tangles

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Hose Assembly

4 top-level lines · 4 rows shown · 6 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Air Hose spray-tan-booth-air-hose 1× 1 · part
2 Fluid Hose spray-tan-booth-fluid-hose 1× 1 · part
3 Quick-Couplers spray-tan-booth-quick-couplers 3× 3 · part
4 Hose Coils spray-tan-booth-hose-coils 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the hose assembly is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $5–$2k. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Kirloskar
kbl.co.in ↗
Pune, IN Pumps & fluid systems 200 units 6–10 wks
🇨🇳Leo Group
leo.com.cn ↗
Taizhou, CN Pumps 200 units 6–10 wks
🇮🇳Shakti Pumps
shaktipumps.com ↗
Pithampur, IN Pumps 200 units 6–10 wks
🇨🇳CNP Pumps
cnppumps.com ↗
Hangzhou, CN Pumps 200 units 6–10 wks
🇮🇳Roto Pumps
rotopumps.com ↗
Noida, IN Pumps 200 units 6–10 wks