Hydraulic Interconnect
AssemblyHigh-pressure hoses linking all four columns to the synchronizer manifold with quick-disconnect couplers. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Hydraulic Interconnect parts and their functions
4 top-level parts · 24 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Main Hose | 4× | SAE 100R2 hose, 1/2" ID, rated 3000 psi, 50 ft per column |
| 2 | Return Hose | 4× | Low-pressure return hose, 3/4" ID, rated 300 psi |
| 3 | Quick Coupler | 8× | Quick-disconnect couplers for field assembly/disassembly |
| 4 | Hose Bracket | 8× | Clamps and brackets for hose organization and routing |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Hydraulic Interconnect
4 top-level lines · 4 rows shown · 24 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Main Hose | mobile-column-lift-hose-main | 4× | 4 | · | part |
| 2 | Return Hose | mobile-column-lift-hose-return | 4× | 4 | · | part |
| 3 | Quick Coupler | mobile-column-lift-hose-quick-coupler | 8× | 8 | · | part |
| 4 | Hose Bracket | mobile-column-lift-hose-routing-bracket | 8× | 8 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the hydraulic interconnect is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $5–$2k. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| kbl.co.in ↗ | Pune, IN | Pumps & fluid systems | 200 units | 6–10 wks |
| leo.com.cn ↗ | Taizhou, CN | Pumps | 200 units | 6–10 wks |
| shaktipumps.com ↗ | Pithampur, IN | Pumps | 200 units | 6–10 wks |
| cnppumps.com ↗ | Hangzhou, CN | Pumps | 200 units | 6–10 wks |
| rotopumps.com ↗ | Noida, IN | Pumps | 200 units | 6–10 wks |