Sensor Head
AssemblyAn eddy-current or magnetic inductive coil inside a ceramic tip that detects the thickness of non-magnetic paint by measuring the gap between the coil and the underlying steel substrate. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Sensor Head parts and their functions
5 top-level parts · 12 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Eddy-Current Coil | 1× | Primary eddy-current induction coil |
| 2 | Reference Coil | 1× | Reference coil for background subtraction |
| 3 | Ceramic Tip | 1× | Ceramic face plate protecting coils |
| 4 | EM Shielding | 1× | Mu-metal and ferrite shielding |
| 5 | SMD Passive (R/C/L) | 8× | Tuning capacitors and resistors |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Sensor Head
5 top-level lines · 5 rows shown · 12 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Eddy-Current Coil | ptg-eddy-coil | 1× | 1 | · | part |
| 2 | Reference Coil | ptg-reference-coil | 1× | 1 | · | part |
| 3 | Ceramic Tip | ptg-ceramic-tip | 1× | 1 | · | part |
| 4 | EM Shielding | ptg-shielding | 1× | 1 | · | part |
| 5 | SMD Passive (R/C/L) | smd-passives | 8× | 8 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the sensor head is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $1–$80. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| sunnyoptical.com ↗ | Ningbo, CN | Optics & camera modules | 1,000 pcs | 8–12 wks |
|
🇨🇳OFILM
ofilm.com ↗
|
Shenzhen, CN | Camera modules | 1,000 pcs | 8–12 wks |
| vvdntech.com ↗ | Gurugram, IN | Electronics & camera modules | 1,000 pcs | 8–12 wks |
| truly.net ↗ | Shanwei, CN | Displays & camera modules | 1,000 pcs | 8–12 wks |
| aactechnologies.com ↗ | Singapore | Acoustics & optics | 1,000 pcs | 8–12 wks |