BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Base & Table

Assembly

Heavy precision cast-iron base providing stable platform and alignment reference. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Base & Table parts and their functions

4 top-level parts · 6 parts in total · full bill of materials below
Base & Table parts diagram: 1 base casting, 2 leveling foot, 3 spindle pad, 4 arm clamp. 6 parts in 4 top-level items.
Base & Table parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Base Casting 1× Cast-iron base 24" × 18" × 6" thick, hand-scraped flat
2 Leveling Foot 3× Threaded leveling feet with lock nuts
3 Spindle Pad 1× Precision-machined pad mounting spindle assembly
4 Arm Clamp 1× Clamp holding chuck support arm to base

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Base & Table

4 top-level lines · 4 rows shown · 6 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Base Casting valve-grinding-machine-base-casting 1× 1 · part
2 Leveling Foot valve-grinding-machine-base-foot-adjuster 3× 3 · part
3 Spindle Pad valve-grinding-machine-base-spindle-mount 1× 1 · part
4 Arm Clamp valve-grinding-machine-base-arm-clamp 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the base & table is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks