Hydraulic Pulling Tower
AssemblyA vertical tower with a telescoping column and a ram-mounted hook, allowing upward, downward, and lateral pulls; three towers provide X, Y, and Z directional control. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Hydraulic Pulling Tower parts and their functions
6 top-level parts · 9 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Tower Column | 1× | Welded vertical steel post, 6–8 feet tall |
| 2 | Tower Base | 1× | Heavy cast-iron base with T-slot mounting feet |
| 3 | Hydraulic Ram | 1× | 10–30 ton double-acting cylinder |
| 4 | Pull Hook | 1× | Adjustable pull hook with secondary pivot |
| 5 | Ball Bearing | 4× | Piston rod and boom-end bearings |
| 6 | Fastener Set | 1× | Tower assembly bolts and lock nuts |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Hydraulic Pulling Tower
6 top-level lines · 6 rows shown · 9 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Tower Column | fsr-tower-column | 1× | 1 | · | part |
| 2 | Tower Base | fsr-tower-base | 1× | 1 | · | part |
| 3 | Hydraulic Ram | fsr-hydraulic-ram | 1× | 1 | · | part |
| 4 | Pull Hook | fsr-ram-hook | 1× | 1 | · | part |
| 5 | Ball Bearing | ball-bearing | 4× | 4 | · | part |
| 6 | Fastener Set | fastener-set | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the hydraulic pulling tower is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $5–$2k. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| kbl.co.in ↗ | Pune, IN | Pumps & fluid systems | 200 units | 6–10 wks |
| leo.com.cn ↗ | Taizhou, CN | Pumps | 200 units | 6–10 wks |
| shaktipumps.com ↗ | Pithampur, IN | Pumps | 200 units | 6–10 wks |
| cnppumps.com ↗ | Hangzhou, CN | Pumps | 200 units | 6–10 wks |
| rotopumps.com ↗ | Noida, IN | Pumps | 200 units | 6–10 wks |