BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Refrigeration Unit

Assembly

Hermetic compressor and refrigerant loop that cools water to 40–50°F, with thermostat control. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Refrigeration Unit parts and their functions

5 top-level parts · 5 parts in total · full bill of materials below
Refrigeration Unit parts diagram: 1 compressor motor, 2 condenser coil, 3 evaporator coil, 4 expansion valve, 5 refrigerant lines. 5 parts in 5 top-level items.
Refrigeration Unit parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Compressor Motor 1× 1/4–1/2 HP sealed motor
2 Condenser Coil 1× Air-cooled radiator and fan
3 Evaporator Coil 1× Water-to-refrigerant heat exchanger
4 Expansion Valve 1× Refrigerant flow regulator
5 Refrigerant Lines 1× Insulated copper tubing bundle

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Refrigeration Unit

5 top-level lines · 5 rows shown · 5 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Compressor Motor drinking-fountain-compressor 1× 1 · part
2 Condenser Coil drinking-fountain-condenser 1× 1 · part
3 Evaporator Coil drinking-fountain-evaporator 1× 1 · part
4 Expansion Valve drinking-fountain-expansion-valve 1× 1 · part
5 Refrigerant Lines drinking-fountain-refrigerant-line 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the refrigeration unit is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks