BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Leader Pipe and Connection

Assembly

Vertical or angled pipe inside or outside the building routing water from the drain to a building drain or storm line. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Leader Pipe and Connection parts and their functions

4 top-level parts · 4 parts in total · full bill of materials below
Leader Pipe and Connection parts diagram: 1 leader pipe, 2 pipe support clamps, 3 elbows and fittings, 4 pipe insulation. 4 parts in 4 top-level items.
Leader Pipe and Connection parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Leader Pipe 1× 2–4 inch cast-iron, PVC, or copper pipe
2 Pipe Support Clamps 1× Plastic or metal pipe clamps at 4–6 foot intervals
3 Elbows and Fittings 1× 90° or 45° elbows routing leader to drain connection
4 Pipe Insulation 1× Optional foam or fiber wrap for freeze protection

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Leader Pipe and Connection

4 top-level lines · 4 rows shown · 4 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Leader Pipe roof-drain-system-leader-pipe 1× 1 · part
2 Pipe Support Clamps roof-drain-system-pipe-clamps 1× 1 · part
3 Elbows and Fittings roof-drain-system-elbows-fittings 1× 1 · part
4 Pipe Insulation roof-drain-system-pipe-insulation 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the leader pipe and connection is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $5–$2k. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Kirloskar
kbl.co.in ↗
Pune, IN Pumps & fluid systems 200 units 6–10 wks
🇨🇳Leo Group
leo.com.cn ↗
Taizhou, CN Pumps 200 units 6–10 wks
🇮🇳Shakti Pumps
shaktipumps.com ↗
Pithampur, IN Pumps 200 units 6–10 wks
🇨🇳CNP Pumps
cnppumps.com ↗
Hangzhou, CN Pumps 200 units 6–10 wks
🇮🇳Roto Pumps
rotopumps.com ↗
Noida, IN Pumps 200 units 6–10 wks