BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Cargo Cover

Assembly

Weather protection over the box: a tensioned fabric lid for fabric trailers or a hinged hard lid for box trailers. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Cargo Cover parts and their functions

4 top-level parts · 6 parts in total · full bill of materials below
Cargo Cover parts diagram: 1 cover fabric, 2 cover bows, 3 cover fasteners, 4 lid hinges. 6 parts in 4 top-level items.
Cargo Cover parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Cover Fabric 1× Waterproof cover
2 Cover Bows 2× Support bows
3 Cover Fasteners 1× Hooks and bungees
4 Lid Hinges 2× Hard-lid hinges (variant)

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Cargo Cover

4 top-level lines · 4 rows shown · 6 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Cover Fabric bct-cover-fabric 1× 1 · part
2 Cover Bows bct-cover-bows 2× 2 · part
3 Cover Fasteners bct-cover-fasteners 1× 1 · part
4 Lid Hinges bct-lid-hinges 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the cargo cover is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks