Wing
AssemblyOne-piece swept supercritical wing carried through under the cabin floor, with integral fuel tanks. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Wing parts and their functions
7 top-level parts · 80 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Wing Spar | 2× | front and rear, tip to tip |
| 2 | Leading-Edge Slat | 4× | High-lift slat segment lowering approach speed. |
| 3 | Fowler Flap | 4× | Trailing-edge flap extending area and camber for landing. |
| 4 | Aileron | 2× | Outboard roll-control surface. |
| 5 | Spoiler Panel | 6× | Multifunction spoiler for roll assist, speed brake and lift dump. |
| 6 | Winglet | 2× | Canted wingtip surface cutting induced drag in cruise. |
| 7 | Fastener Set | 60× | Bolts, nuts, and washers. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Wing
7 top-level lines · 7 rows shown · 80 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Wing Spar | business-jet-wing-spar | 2× | 2 | · | part |
| 2 | Leading-Edge Slat | business-jet-slat | 4× | 4 | · | part |
| 3 | Fowler Flap | business-jet-flap | 4× | 4 | · | part |
| 4 | Aileron | business-jet-aileron | 2× | 2 | · | part |
| 5 | Spoiler Panel | business-jet-spoiler | 6× | 6 | · | part |
| 6 | Winglet | business-jet-winglet | 2× | 2 | · | part |
| 7 | Fastener Set | fastener-set | 60× | 60 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the wing is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatforge.com ↗ | Pune, IN | Forgings & metal parts | 500 pcs | 6–10 wks |
| dicastal.com ↗ | Qinhuangdao, CN | Aluminium castings & wheels | 500 pcs | 6–10 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 pcs | 6–10 wks |
|
🇸🇬Beyonics
beyonics.com ↗
|
Singapore | Precision metal & mfg | 500 pcs | 6–10 wks |
| sundaram-clayton.com ↗ | Chennai, IN | Die castings | 500 pcs | 6–10 wks |