BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Upper Fixed Block

Assembly

A single pulley housed in a metal bracket, fixed to the ceiling, redirecting rope from hand-pulling downward to lift the lower block. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Upper Fixed Block parts and their functions

3 top-level parts · 4 parts in total · full bill of materials below
Upper Fixed Block parts diagram: 1 upper pulley wheel, 2 upper block housing, 3 upper mounting bolt. 4 parts in 3 top-level items.
Upper Fixed Block parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Upper Pulley Wheel 1× Steel or nylon sheave, 2–3 inch diameter, ball bearings
2 Upper Block Housing 1× Aluminum or steel bracket enclosing the pulley
3 Upper Mounting Bolt 2× Heavy-duty bolts securing block to rafter bracket

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Upper Fixed Block

3 top-level lines · 3 rows shown · 4 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Upper Pulley Wheel ceiling-bike-hoist-upper-pulley-wheel 1× 1 · part
2 Upper Block Housing ceiling-bike-hoist-upper-block-housing 1× 1 · part
3 Upper Mounting Bolt ceiling-bike-hoist-upper-mounting-bolt 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the upper fixed block is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks