BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Parachute System

Assembly

Main recovery canopy and the releases that free the occupant from the seat before it inflates. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Parachute System parts and their functions

4 top-level parts · 4 parts in total · full bill of materials below
Parachute System parts diagram: 1 main parachute, 2 parachute container, 3 riser set, 4 barostat release. 4 parts in 4 top-level items.
Parachute System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Main Parachute 1× ~6.5 m aeroconical
2 Parachute Container 1× headbox
3 Riser Set 1× Webbing risers connecting the canopy to the harness once the occupant separates from the seat.
4 Barostat Release 1× Pressure-and-time lock delaying man-seat separation above ~3,000 m so the occupant free-falls through thin cold air on the drogue.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Parachute System

4 top-level lines · 4 rows shown · 4 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Main Parachute ejection-seat-main-parachute 1× 1 · part
2 Parachute Container ejection-seat-parachute-container 1× 1 · part
3 Riser Set ejection-seat-riser-set 1× 1 · part
4 Barostat Release ejection-seat-barostat-release 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the parachute system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks