BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Survival Kit

Assembly

Seat-pan container that descends with the occupant carrying oxygen, raft, beacon and survival stores. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Survival Kit parts and their functions

4 top-level parts · 4 parts in total · full bill of materials below
Survival Kit parts diagram: 1 survival pack, 2 emergency oxygen bottle, 3 locator beacon, 4 drop lanyard. 4 parts in 4 top-level items.
Survival Kit parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Survival Pack 1× raft, water, signals
2 Emergency Oxygen Bottle 1× emergency supply
3 Locator Beacon 1× 406 MHz
4 Drop Lanyard 1× Line lowering the survival pack to hang below the descending pilot, clearing it before ground impact.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Survival Kit

4 top-level lines · 4 rows shown · 4 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Survival Pack ejection-seat-survival-pack 1× 1 · part
2 Emergency Oxygen Bottle ejection-seat-oxygen-bottle 1× 1 · part
3 Locator Beacon ejection-seat-locator-beacon 1× 1 · part
4 Drop Lanyard ejection-seat-drop-lanyard 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the survival kit is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks