Drivetrain
AssemblyA 1x11 or 1x12 mountain drivetrain on a fat-specific crankset whose pedals sit ~30 mm wider apart than normal so the crank arms clear the bulged chainstays. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Drivetrain parts and their functions
7 top-level parts · 8 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Fat Crankset | 1× | Wide-Q crankset |
| 2 | Bottom Bracket | 1× | 100 mm shell BB |
| 3 | Cassette | 1× | 10-51T cassette |
| 4 | Chain | 1× | 12-speed roller chain run with cold-rated wet lube; standard lubes thicken and shift poorly below -10 °C. |
| 5 | Clutch Rear Derailleur | 1× | Clutch derailleur |
| 6 | Trigger Shifter | 1× | Trigger shifter |
| 7 | Platform Pedals | 2× | Platform pedals |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Drivetrain
7 top-level lines · 7 rows shown · 8 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Fat Crankset | fat-crankset | 1× | 1 | · | part |
| 2 | Bottom Bracket | fat-bottom-bracket | 1× | 1 | · | part |
| 3 | Cassette | fat-cassette | 1× | 1 | · | part |
| 4 | Chain | fat-chain | 1× | 1 | · | part |
| 5 | Clutch Rear Derailleur | fat-rear-derailleur | 1× | 1 | · | part |
| 6 | Trigger Shifter | fat-shifter | 1× | 1 | · | part |
| 7 | Platform Pedals | fat-pedals | 2× | 2 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the drivetrain is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.01–$2. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| sundram.com ↗ | Chennai, IN | Fasteners | 10,000 pcs | 3–5 wks |
| lpsindia.com ↗ | Rohtak, IN | Fasteners | 10,000 pcs | 3–5 wks |
| escort-fastener.com ↗ | Suzhou, CN | Fasteners | 10,000 pcs | 3–5 wks |
| tbfastener.com ↗ | Shanghai, CN | Fasteners | 10,000 pcs | 3–5 wks |
| sterlingtools.in ↗ | Faridabad, IN | Fasteners | 10,000 pcs | 3–5 wks |