Visual System
AssemblyCollimated cross-cockpit display giving both pilots a correct 200 x 40 degree out-the-window scene focused at infinity. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Visual System parts and their functions
5 top-level parts · 7 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Projector | 3× | laser-phosphor, edge-blended |
| 2 | Back-Projection Screen | 1× | back-projection screen |
| 3 | Collimating Mirror | 1× | mylar spherical mirror |
| 4 | Image Generator | 1× | GPU cluster rendering the visual database at 60 Hz with under 50 ms transport delay. |
| 5 | Alignment Camera | 1× | Calibration camera measuring geometry and blend zones for automatic projector alignment. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Visual System
5 top-level lines · 5 rows shown · 7 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Projector | flight-simulator-projector | 3× | 3 | · | part |
| 2 | Back-Projection Screen | flight-simulator-bp-screen | 1× | 1 | · | part |
| 3 | Collimating Mirror | flight-simulator-collimating-mirror | 1× | 1 | · | part |
| 4 | Image Generator | flight-simulator-image-generator | 1× | 1 | · | part |
| 5 | Alignment Camera | flight-simulator-alignment-camera | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the visual system is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |