BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Fuselage

Assembly

Slender composite pod with cockpit and a thin tail boom. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Fuselage parts and their functions

5 top-level parts · 5 parts in total · full bill of materials below
Fuselage parts diagram: 1 pod shell, 2 tail boom, 3 main frame, 4 cockpit floor, 5 nose cone. 5 parts in 5 top-level items.
Fuselage parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Pod Shell 1× Cockpit pod shell
2 Tail Boom 1× Tapered tail boom
3 Main Frame 1× Wing carry-through frame
4 Cockpit Floor 1× Seat pan and floor
5 Nose Cone 1× Nose fairing

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Fuselage

5 top-level lines · 5 rows shown · 5 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Pod Shell glider-sailplane-pod-shell 1× 1 · part
2 Tail Boom glider-sailplane-tail-boom 1× 1 · part
3 Main Frame glider-sailplane-main-frame 1× 1 · part
4 Cockpit Floor glider-sailplane-cockpit-floor 1× 1 · part
5 Nose Cone glider-sailplane-nose-cone 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the fuselage is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Bharat Forge
bharatforge.com ↗
Pune, IN Forgings & metal parts 500 pcs 6–10 wks
dicastal.com ↗ Qinhuangdao, CN Aluminium castings & wheels 500 pcs 6–10 wks
tataautocomp.com ↗ Pune, IN Auto components 500 pcs 6–10 wks
🇸🇬Beyonics
beyonics.com ↗
Singapore Precision metal & mfg 500 pcs 6–10 wks
sundaram-clayton.com ↗ Chennai, IN Die castings 500 pcs 6–10 wks