Drivetrain
AssemblyLong chain run from the hand cranks to the front-wheel cassette through idler pulleys, with a rear-style derailleur and grip shifter giving a wide multi-speed range for climbing. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Drivetrain parts and their functions
5 top-level parts · 10 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Chain | 2× | Long double-length chain run |
| 2 | Cassette | 1× | Multi-speed cassette |
| 3 | Derailleur 3 parts | 1× | Indexed derailleur |
| 4 | Idler Pulley | 2× | Chain routing idlers |
| 5 | Chain Guide Tube | 1× | Chain guide tube |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Drivetrain
5 top-level lines · 8 rows shown · 10 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Chain | chain | 2× | 2 | · | part |
| 2 | Cassette | hand-cycle-cassette | 1× | 1 | · | part |
| 3 | Derailleur 3 parts | hand-cycle-derailleur | 1× | 1 | 4 | assembly |
| 3.1 | Derailleur Cage | hand-cycle-derailleur-cage | 1× | 1 | · | part |
| 3.2 | Derailleur Spring | hand-cycle-derailleur-spring | 1× | 1 | · | part |
| 3.3 | Jockey Wheel | hand-cycle-jockey-wheel | 2× | 2 | · | part |
| 4 | Idler Pulley | hand-cycle-idler-pulley | 2× | 2 | · | part |
| 5 | Chain Guide Tube | hand-cycle-chain-tube | 1× | 1 | · | part |
Where the drivetrain is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.01–$2. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| sundram.com ↗ | Chennai, IN | Fasteners | 10,000 pcs | 3–5 wks |
| lpsindia.com ↗ | Rohtak, IN | Fasteners | 10,000 pcs | 3–5 wks |
| escort-fastener.com ↗ | Suzhou, CN | Fasteners | 10,000 pcs | 3–5 wks |
| tbfastener.com ↗ | Shanghai, CN | Fasteners | 10,000 pcs | 3–5 wks |
| sterlingtools.in ↗ | Faridabad, IN | Fasteners | 10,000 pcs | 3–5 wks |