BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Empennage

Assembly

Tail group with a 22.2 m-span horizontal stabiliser that doubles as a trim fuel tank on later models. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Empennage parts and their functions

5 top-level parts · 180,008 parts in total · full bill of materials below
Empennage parts diagram: 1 vertical stabiliser, 2 horizontal stabiliser, 3 rudder, 4 elevator, 5 rivet / lockbolt. 180,008 parts in 5 top-level items.
Empennage parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Vertical Stabiliser 1× Fin box reaching 19.4 m above the ground at the tail.
2 Horizontal Stabiliser 1× Trimmable tailplane, screw-jack pivoted, holding 12,490 L of trim fuel on the 747-400.
3 Rudder 2× Upper and lower segments
4 Elevator 4× Inboard and outboard pairs
5 Rivet / Lockbolt 180000× Empennage fastening

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Empennage

5 top-level lines · 5 rows shown · 180,008 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Vertical Stabiliser jumbo-jet-vertical-stabiliser 1× 1 · part
2 Horizontal Stabiliser jumbo-jet-horizontal-stabiliser 1× 1 · part
3 Rudder jumbo-jet-rudder 2× 2 · part
4 Elevator jumbo-jet-elevator 4× 4 · part
5 Rivet / Lockbolt jumbo-jet-rivet 180000× 180,000 · part

Something wrong in this list? Report a problem with this BOM.

Where the empennage is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks